| Week | Activities | Assessment |
|---|---|---|
| 1 |
|
- |
| 2 | Project implementation, including review of objectives, scope, and methodology with the supervisor. | Progress Report |
| 3 | Project implementation under the guidance of the supervisor. | - |
| 4 | Project implementation under the guidance of the supervisor. | - |
| 5 | Project implementation under the guidance of the supervisor. | - |
| 6 | Project implementation under the guidance of the supervisor. | - |
| 7 | Project implementation under the guidance of the supervisor. | - |
| 8 | Progress Presentation and submission of the draft final report for review. |
• Progress Presentation (10%) • Project Task 1 (Video 1) (10%) • Progress Report |
| 9 | Continue project implementation and improve the project based on panel feedback. | - |
| 10 | Data collection and analysis. | - |
| 11 | Continue data collection and analysis. |
• Project Task 2 (Video 2) (10%) • Progress Report |
| 12 | Preparation for the Final Project Presentation. | - |
| 13 | Final Project Presentation and submission of the draft final report for review. |
• Final Presentation (20%) • Progress Report |
| 14 | Final revision of the report and supervisor's review before final submission. |
• Logbook (20%) • Final Report (30%) |
Prepared by:
Nik Mohd Iznan bin Tuan Yaakub
Final Year Project 2 Coordinator
(Computer-generated signature is not required)
Nik Mohd Iznan bin Tuan Yaakub
Final Year Project 2 Coordinator
(Computer-generated signature is not required)
Reviewed by:
Sapliza binti Mahmud
Head of Diploma in Civil Engineering Programme
(Computer-generated signature is not required)
Sapliza binti Mahmud
Head of Diploma in Civil Engineering Programme
(Computer-generated signature is not required)
Approved by:
Mohd Azmi bin Zulkifli
Head of Civil Engineering Department
(Computer-generated signature is not required)
Mohd Azmi bin Zulkifli
Head of Civil Engineering Department
(Computer-generated signature is not required)